Harrow School London, United Kingdom
Harrow School
Author
publish
Posted
![](/wp-content/uploads/2015/01/Horrow-School-London-Boys-Ryan-Theatre-Facade-1370x969.jpg)
In May 2013, AMPC were asked by Harrow School to look at the current state of their Ryan Theatre, originally built in 1994. This involved a physical review of the building including the equipment and infrastructure as well as an operational review from a staffing and health & safety perspective. AMPC made a number of recommendations to the school – many of them small moves – which collectively would enable the smooth-running of the department, and the capacity to expand and improve.
![](/wp-content/uploads/2015/01/Ryan-Theatre.jpg)